Contact us for a Free Quote today

402-764-6666

Papillion Roof Installation on Garages and Additions

A new Papillion garage roof has to die into a ranch that was never flashed for it. We build the step, ice-barrier the new eave, and match the field if the blend still exists.

Roof Replacement
Siding Installation
Gutter Installation

Get your FREE
Quote Today

Customer review and BBB rating badges

Omaha Google: 5.0 from 7 reviews

The Tie-In.

How We Install on a Papillion Addition

Open the old wall: We recut step flashing. A bead of caulk on the ranch siding is a two-year leak.

Match or write the difference: If the shingle is discontinued, we say so before the dumpster. No surprise two-tone.

Papillion permit path: If the addition is already permitted, we keep the roof on that paper. A stand-alone house re-roof is its own permit.

New roof installation with drip edge
Roof deck prepared for new shingles

New Wood Rules

What Goes Under a New Papillion Roof

Ice-and-water on the new eave: Low garage additions ice first. We do not skip the membrane.

Do not close the only intake: If the addition sealed the original soffit, the old field will cook. We point at it.

Low slope is a membrane: A 2/12 porch is not rolled roofing on a house. We write the right covering.

Frequently Asked Questions

Yes. The job is the tie-in and drainage. Squares are the easy part.

If the line is still sold. If not, we show the closest on the house in daylight.

If it is part of a permitted addition, we coordinate. A re-roof of the main house is a City of Papillion permit.

Get In Touch With Us

Feel free to reach out to us anytime.
We're here to help!

Send Us a Message